Refurbishment

LCL Site services Division specialise in the refurbishment of Long & Crawford equipment both 'in-situ' within the substation or clients units returned to our St Helens factory.


Performing the refurbishment 'in-situ' removes the need to disrupt the existing HV cable connections, disturb cable radius. Thereby reducing the risk of future HV cable faults as a result of insulation breakdown.


Our refurbishments follow a detailed schedule of work, inspection and test. (See What we do).


As an extension to our refurbishment programme, we also offer a range of service enhanced products to extend the life-cycle of the original equipment. (See Additional Extras).


We also work in partnership with REC's to assist with failure investigations and design improvements to provide a solution and to undertake site rectification as required.



What We Do

Refurbishment Works

Refurbishment Works

Refurbishment Works

  1. Check Main and Earth contact condition/operation, factory settings, replace and re-calibrate / dress as necessary.
  2. Inspect and replace as necessary 1 phase and 3 phase mouldings. 
  3. Upgrade Fuse Switch fixed contacts.
  4. Dress Fuse Switch moving contacts.
  5. Replace all indicators, windows, gaskets and labels.
  6. Check all fixings are secure.
  7. Address oil and compound  leaks.
  8. Invasive clean to the internal tank and flush with clean oil.
  9. Full external service prep and re finish with OEM paint.
  10. Full electrical test including power frequency and resistance test.
  11. Fit new OEM gaskets and refill with new oil.
  12. Replace original top cover fixings with new captive stainless steel type.

Additional Extras

Refurbishment Works

Refurbishment Works

  1. Stainless steel cable boxes and earth straps.
  2. Stainless steel main and access cover fabrications.
  3. Replace sheared front cover studs.
  4. Replace Fuse switch trip arm pivot point bushing. (pre 1988).
  5.  Replace (as necessary) original fuse clips to SRBP type c/w new pins. 

Before/After Gallery

1 'Before'

    Copyright © 2024 Long Controls Limited - All Rights Reserved.


    Long Controls Limited Committed to Excellence

    Cookie Policy

    This website uses cookies. By continuing to use this site, you accept our use of cookies.

    Accept & Close